Tuesday, June 1, 2010

The bulkhead Part 3





















Heres the left Footwell. Thankfully the left hand side of the bulkhead isnt as bad as the right, so it was really just small patch up jobs. Here we just did what we did with the other footwell, the rust was cut out, the measurements were taken, the steel was cut and we put the grooves in, and then patched it in with the migwelder, and this is how it looked in the end!














No comments:

Post a Comment